Re: Lao Railway Progress

Post by FrazeeDK » January 10, 2018, 9:44 pm

just a grain of salt.. Official Lao government update on the Railway project; 16% complete.. On schedule for completion in 2021. http://kpl.gov.la/En/Detail.aspx?id=30951

much further to the south, start on the first 3.5km Thai-China "high speed rail" began in Khorat Province
http://www.construction-property.com/read-more-934


Dave

User avatar
stattointhailand
udonmap.com
Posts: 19114
Joined: October 25, 2007, 11:34 pm
Location: Oiling the locks on my gun case

Re: Lao Railway Progress

Post by stattointhailand » January 10, 2018, 10:05 pm

"According to Mr Pichit, a first group of 76 Chinese engineers have undergone training and sat exams to test their understanding of Thai law and professional code of ethics as well as their engineering expertise. "

come on ...... NOBODY has any chance whatsoever of understanding Thai Law and professional code of ethics :yikes: ](*,)

Silly me ...... Rule No 1 ..... No poofte ......xx sorry

Rule No 1, pay the trainer the required sum to pass the test :lol:

User avatar
Giggle
udonmap.com
Posts: 1895
Joined: October 18, 2016, 4:24 pm
Location: In your head

Re: Lao Railway Progress

Post by Giggle » January 10, 2018, 10:30 pm

Are you trying to tell us everything in Thailand is all a big charade? :?
No way! It can't be true! :D
Ashli Babbitt -- SAY HER NAME!

User avatar
FrazeeDK
udonmap.com
Posts: 4909
Joined: February 13, 2006, 2:02 am
Location: Udon Thani Thailand

Re: Lao Railway Progress

Post by FrazeeDK » January 11, 2018, 9:04 pm

but the Chinese engineers must adhere to the requisite laws and regulations as they plan and build the new railway!! Frankly, I'd just like to see them "git er' done"... The Kingdom will suffer embarrassment if the Chinese up in Laos have that run finished from the Mekong all the way up to Kunming and all they have over here is a few kilometers of high speed to nowhere...
Dave

nmcd1649
udonmap.com
Posts: 111
Joined: July 28, 2014, 4:09 pm
Location: Cork/Udon

Re: Lao Railway Progress

Post by nmcd1649 » January 14, 2018, 10:25 am

Spending a few days in Bua Yai just off Route 2 at Sida north of Korat. Major works going on around the railway station...a new flyover at the level crossing on toad in from Sida and another flyover at opposite side of the town. Large area of land around the station cleared and levelled. Huge concrete slabs being poured and constructed and major works along the rail line going in the direction of Korat. Looks like Bua Yai is to be a major hub for the new rail line.
We don't stop playing because we grow old we grow old because we stop playing......"George Bernard Shaw"...

User avatar
parrot
udonmap.com
Posts: 10925
Joined: March 19, 2006, 8:32 pm

Re: Lao Railway Progress

Post by parrot » January 14, 2018, 11:13 am

FrazeeDK wrote:
January 11, 2018, 9:04 pm
but the Chinese engineers must adhere to the requisite laws and regulations as they plan and build the new railway!! Frankly, I'd just like to see them "git er' done"... The Kingdom will suffer embarrassment if the Chinese up in Laos have that run finished from the Mekong all the way up to Kunming and all they have over here is a few kilometers of high speed to nowhere...

The last I read is that the Thai gov has downgraded the 'speed' aspect of any new railroad. If I were a bettin' man, I'd bet on the Lao portion to be well done......maybe even before the Thais get started. The SRT is going the way of the Panama railroad and dinosaurs.

User avatar
FrazeeDK
udonmap.com
Posts: 4909
Joined: February 13, 2006, 2:02 am
Location: Udon Thani Thailand

Re: Lao Railway Progress

Post by FrazeeDK » January 14, 2018, 10:05 pm

SRT still has plans for double tracking the one meter gauge rail all the way to Nong Khai. The pillars for an elevated track are built in most of Khon Kaen now and Khorat is doing the same. They're also planning a one meter rail link from south of KK to Sakon Nakon/NKP.
The Chinese engineered and built broad gauge "high speed railway" will get done in my opinion but indeed will not "kick start" until significant progress is made on the Boten-Vientiane rail line.. I honestly don't expect the Nong Khai to Bangkok "high speed" rail to take the four years the Lao rail will take in total. The terrain in Issan is far more conducive to putting in the line much quicker from an engineering standpoint. Far less bridges than Laos and probably just a few tunnels at the edge of the Khorat Plateau leading down towards Saraburi. I'm sure most hold up on this side of the Mekong will be administratively linked..
Dave

User avatar
stattointhailand
udonmap.com
Posts: 19114
Joined: October 25, 2007, 11:34 pm
Location: Oiling the locks on my gun case

Re: Lao Railway Progress

Post by stattointhailand » January 14, 2018, 10:31 pm

FrazeeDK wrote:
January 14, 2018, 10:05 pm
SRT still has plans for double tracking the one meter gauge rail all the way to Nong Khai. The pillars for an elevated track are built in most of Khon Kaen now and Khorat is doing the same. They're also planning a one meter rail link from south of KK to Sakon Nakon/NKP.
The Chinese engineered and built broad gauge "high speed railway" will get done in my opinion but indeed will not "kick start" until significant progress is made on the Boten-Vientiane rail line.. I honestly don't expect the Nong Khai to Bangkok "high speed" rail to take the four years the Lao rail will take in total. The terrain in Issan is far more conducive to putting in the line much quicker from an engineering standpoint. Far less bridges than Laos and probably just a few tunnels at the edge of the Khorat Plateau leading down towards Saraburi. I'm sure most hold up on this side of the Mekong will be administratively linked..

Chinese engineers asking Thai locals for directions could be a major stumbling block 8-[

User avatar
tamada
udonmap.com
Posts: 17218
Joined: February 21, 2007, 4:03 am
Location: Down two...then left

Re: Lao Railway Progress

Post by tamada » January 15, 2018, 6:26 am

FrazeeDK wrote:
January 14, 2018, 10:05 pm
SRT still has plans for double tracking the one meter gauge rail all the way to Nong Khai. The pillars for an elevated track are built in most of Khon Kaen now and Khorat is doing the same. They're also planning a one meter rail link from south of KK to Sakon Nakon/NKP.
The Chinese engineered and built broad gauge "high speed railway" will get done in my opinion but indeed will not "kick start" until significant progress is made on the Boten-Vientiane rail line.. I honestly don't expect the Nong Khai to Bangkok "high speed" rail to take the four years the Lao rail will take in total. The terrain in Issan is far more conducive to putting in the line much quicker from an engineering standpoint. Far less bridges than Laos and probably just a few tunnels at the edge of the Khorat Plateau leading down towards Saraburi. I'm sure most hold up on this side of the Mekong will be administratively linked..
From a buddy of mine who was closely involved with the the project planning during the off-again, on-again negotiations between 2014 and 2016, the Thai's rejected the initial Chinese financing package that included exclusive commercial rights for 50 m either side of the tracks. The same deal that the Lao government rolled over on.

Despite being technically more challenging, the Lao bit would have been a relative breeze when it came to 'permitting' compared with Thailand where the line traverses mostly used and usable land with a much heavier population density. I am covering 2 projects in Myanmar at the moment and the really remote, mountainous, big one is moving on a lot faster than the smaller one that is working around farm land and townships nearer Yangon.

User avatar
stattointhailand
udonmap.com
Posts: 19114
Joined: October 25, 2007, 11:34 pm
Location: Oiling the locks on my gun case

Re: Lao Railway Progress

Post by stattointhailand » January 15, 2018, 10:50 am

Similar to Channel Tunnel Rail link in UK which used existing low speed lines and railway owned land in the London area before getting its own High speed section out in the Kent countryside.

User avatar
FrazeeDK
udonmap.com
Posts: 4909
Joined: February 13, 2006, 2:02 am
Location: Udon Thani Thailand

Re: Lao Railway Progress

Post by FrazeeDK » February 10, 2018, 4:59 pm

Dave

User avatar
FrazeeDK
udonmap.com
Posts: 4909
Joined: February 13, 2006, 2:02 am
Location: Udon Thani Thailand

Re: Lao Railway Progress

Post by FrazeeDK » April 13, 2018, 7:41 pm

Dave

User avatar
FrazeeDK
udonmap.com
Posts: 4909
Joined: February 13, 2006, 2:02 am
Location: Udon Thani Thailand

Re: Lao Railway Progress

Post by FrazeeDK » June 17, 2018, 11:13 am

longest bridge of Lao-China railway project complete in the north suburbs of Vientiane: http://europe.chinadaily.com.cn/a/20180 ... 9d4f2.html
Dave

User avatar
FrazeeDK
udonmap.com
Posts: 4909
Joined: February 13, 2006, 2:02 am
Location: Udon Thani Thailand

Re: Lao Railway Progress

Post by FrazeeDK » June 17, 2018, 11:23 am

some additional current photos of the railway construction from Skyscraper City. https://www.skyscrapercity.com/showthre ... 15125[url][/url]
Dave

User avatar
parrot
udonmap.com
Posts: 10925
Joined: March 19, 2006, 8:32 pm

Re: Lao Railway Progress

Post by parrot » June 17, 2018, 7:06 pm

Am I imagining things.......or is Laos catching up to the rest of the world?

User avatar
FrazeeDK
udonmap.com
Posts: 4909
Joined: February 13, 2006, 2:02 am
Location: Udon Thani Thailand

Re: Lao Railway Progress

Post by FrazeeDK » June 18, 2018, 5:49 pm

quickly being subsumed into a vassal state of China.. The Lao government took Chinese loans in the billions to build the railway.. If true to the form of Chinese loans around the world, the Lao will default and the Chinese take about a 30 year ownership of the line.. As for moving forward, I'd say that the majority of the largesse is being received by the top echelon of society over there... There are incredible proven mineral deposits in Laos that the Lao government put the brakes on exploiting back around 2006.. Specifically huge bauxite (for aluminum) down in the Bolovens Plateau.. I'd say a lot of it is being held for the northern fraternal socialist friends..
Dave

User avatar
tamada
udonmap.com
Posts: 17218
Joined: February 21, 2007, 4:03 am
Location: Down two...then left

Re: Lao Railway Progress

Post by tamada » June 19, 2018, 4:34 am

parrot wrote:
June 17, 2018, 7:06 pm
Am I imagining things.......or is Laos catching up to the rest of the world?
If judging Lao economic progress by the number of moneyed Laotians loading up their Cayenne's and Denali's with toilet bowls and kitchen sinks at HomePro, then no.

User avatar
tamada
udonmap.com
Posts: 17218
Joined: February 21, 2007, 4:03 am
Location: Down two...then left

Re: Lao Railway Progress

Post by tamada » June 19, 2018, 4:35 am

FrazeeDK wrote:
June 18, 2018, 5:49 pm
quickly being subsumed into a vassal state of China.. The Lao government took Chinese loans in the billions to build the railway.. If true to the form of Chinese loans around the world, the Lao will default and the Chinese take about a 30 year ownership of the line.. As for moving forward, I'd say that the majority of the largesse is being received by the top echelon of society over there... There are incredible proven mineral deposits in Laos that the Lao government put the brakes on exploiting back around 2006.. Specifically huge bauxite (for aluminum) down in the Bolovens Plateau.. I'd say a lot of it is being held for the northern fraternal socialist friends..
Thailand 4.0

Same same, but different.

User avatar
Laan Yaa Mo
udonmap.com
Posts: 9185
Joined: February 7, 2007, 9:12 am
Location: ขอนแก่น

Re: Lao Railway Progress

Post by Laan Yaa Mo » June 19, 2018, 5:13 am

It reminds one of the way the European powers, Japan and the USA carved up China back in the days of the Dowager Empress.
You only pass through this life once, you don't come back for an encore.

User avatar
FrazeeDK
udonmap.com
Posts: 4909
Joined: February 13, 2006, 2:02 am
Location: Udon Thani Thailand

Re: Lao Railway Progress

Post by FrazeeDK » June 19, 2018, 7:59 pm

ah but now its the dragon eating those little geckos...
Dave